With the increase in platform availability from web, mobile, and iTV, and the widening of use from business to social media, the range and type of interactive media projects has increased dramatically over the last few years.
This places an added burden on developers since the type of project together with its intended audience shapes the relevant content and interactivity (interface). The platforms dictate their own interface limitations on top of the concept of relevance as well. So, the mix of decisions has escalated, the work with the client to define the scope of the project has splintered, the need for a strong project management hand in the developers has increased.
We had problems enough to define the type of interactive projects in a business context a few years ago. In the end we took a project management stance looking at the context in which they succeeded and what clients had found going wrong. This included things such as the objectives of the business changing from the agreed objectives during the lifetime of the project so that although the project was completed according to the original scope, time and budget, it didn't then meet with the changed business/market direction. We highlighted other dilemmas where the developers knew more about the interactive market needs than the clients, but the clients didn't listen and then the ultimate project was found by them not to work in the market as they wanted. Finally, we admitted that sometimes projects don't succeed because the users find them too problematic to use. This might occur because the clients dictated the interactive interface without understanding or trialling use, or that the developers didn't stress this as an absolute so that their design didn't function as it should.
We went on to define the type of project an interactive company does according to where their time was spent. This fell under the categories: client, bread and butter, investment projects, Maintenance projects, quick fix, R and D, Good will, Pitches/tenders. (See Chapter 1 of Managing Interactive Media: Project management for Web and Digital Media.)
How one categorises the type of project depends on many factors. Although our concept remains good in principle, it needs expanding perhaps. But where you spend your time and effort might still work for you as a company.
The only other place we can hope to see a definition of project types might lie in the categories of awards put forward by the interactive associations. Take a quick look at these because each awards group defines them very differently and/or concentrate on particular aspects of development. It's fascinating – well we think so. Maybe it'll encourage you to enter some of your projects for awards. Many categories are still open for 2011. Good luck.
Thursday, 23 June 2011
Saturday, 18 June 2011
Scope creep - not our problem
Well wouldn't it be nice if we could say that! It's the bane of every project. But we can and do take measures to control changes/creep, don't we? It's always a good thing to remind ourselves of basic sound principles that will work in our favour and that's the point of this week's spotlight on recent insights into dealing with creep.
Just in case, scope creep means changes to a project that necessitate extra work often wanted for free. Ah! Yes! Remember what it means now? It's those projects where clients keep expanding what they want as they go along after a price has been established for a particular set of needs. There's a lovely admission of guilt from a client who realises they do this at I'm a self-inflicted scope-creeper! Arggh, on Bracket Project's web site, and the comments on this read reassuringly too.
Mind you, sometimes it isn't just the clients who get inspiration and want to change a few things. These ideas can come from your team and management too. Someone has to stand firm and focus all back on the objectives agreed. Is that person you? Often it is part of the project manager's role.
Patsy from Front - web strategy, design and technology studio - in Manning up your project crew defines the roles needed on a web design team recognising that someone has to stand firm on the scope creep issues. She defines the person as a Guardian. Perhaps that appeals to you more than the title Project Manager.
If you're sitting there wondering that it's all very well but how do we stop creep, How to identify and clarify a Project Scope, Dwight Dunkley 6th June 2011, gives strong sharp advice. Do scroll down to the Tips and Advice part of the page to get the most benefit.
Of course we address this a lot in our Chapter 3 Scoping the project in Managing Interactive Media - Project Management for Web and Digital Media, but we're always willing to listen and find a new perspective; anything that can help in one of the most crucial issues to affect our projects. Any more advice is very welcome.
Just in case, scope creep means changes to a project that necessitate extra work often wanted for free. Ah! Yes! Remember what it means now? It's those projects where clients keep expanding what they want as they go along after a price has been established for a particular set of needs. There's a lovely admission of guilt from a client who realises they do this at I'm a self-inflicted scope-creeper! Arggh, on Bracket Project's web site, and the comments on this read reassuringly too.
Mind you, sometimes it isn't just the clients who get inspiration and want to change a few things. These ideas can come from your team and management too. Someone has to stand firm and focus all back on the objectives agreed. Is that person you? Often it is part of the project manager's role.
Patsy from Front - web strategy, design and technology studio - in Manning up your project crew defines the roles needed on a web design team recognising that someone has to stand firm on the scope creep issues. She defines the person as a Guardian. Perhaps that appeals to you more than the title Project Manager.
If you're sitting there wondering that it's all very well but how do we stop creep, How to identify and clarify a Project Scope, Dwight Dunkley 6th June 2011, gives strong sharp advice. Do scroll down to the Tips and Advice part of the page to get the most benefit.
Of course we address this a lot in our Chapter 3 Scoping the project in Managing Interactive Media - Project Management for Web and Digital Media, but we're always willing to listen and find a new perspective; anything that can help in one of the most crucial issues to affect our projects. Any more advice is very welcome.
Saturday, 11 June 2011
Conflict resolution and the workplace
Those of you that did our project management course will know that this is one of my favourite topics. iMedia teams are necessarily cross-functional with their skill sets and this can lead to more differences of opinion/perspective as a result. Then add in the different personalities and the risk for conflict increases again. It still has not been appreciated that conflict in the workplace has increased in businesses perhaps as a result of workers being squeezed for more work and the tougher working conditions during and continuing after the recession.
I was pleased to find that some figures - meaning monetary values - had started to be put against the cost of conflict in the workplace. Often it is only once a problem has been quantified in terms of money that management realise that minimising this can bring dividends. See Workplace Mediation - Dispute Resolution at Coaching 4 Success, and How to stop Conflict in the Workplace before it Happens, at eHow by Coleen Reinhart, May 2011.
£33 billion in the UK annually makes you think, doesn't it? So much management time, so much team member time and emotions all operating against productivity.
We advocated the use of ground rules where all team members (including management) agree on how to conduct themselves in any discord situation, what procedures to follow and who to use as a mediator if necessary. This signing up to ground rules continues to be a strategy that is recommended but we realised that the culture of some of your organisations might not find this acceptable. The concept of ground rules is reiterated and expanded in the Interest-based Relational Approach (IBR) section of Mindtools , Conflict Resolution - resolving conflict rationally and effectively, and Barbara Bradbury addresses the concept in a lighter fashion in Resolving Conflict - 7 Inspired Tips for leaders, May 2011.
And, just to end on a visual note for those that have a more pictorial learning style, you'll appreciate the myriad images used to try and capture that conflict moment! Which makes most sense to you?
Happy resolutions!
I was pleased to find that some figures - meaning monetary values - had started to be put against the cost of conflict in the workplace. Often it is only once a problem has been quantified in terms of money that management realise that minimising this can bring dividends. See Workplace Mediation - Dispute Resolution at Coaching 4 Success, and How to stop Conflict in the Workplace before it Happens, at eHow by Coleen Reinhart, May 2011.
£33 billion in the UK annually makes you think, doesn't it? So much management time, so much team member time and emotions all operating against productivity.
We advocated the use of ground rules where all team members (including management) agree on how to conduct themselves in any discord situation, what procedures to follow and who to use as a mediator if necessary. This signing up to ground rules continues to be a strategy that is recommended but we realised that the culture of some of your organisations might not find this acceptable. The concept of ground rules is reiterated and expanded in the Interest-based Relational Approach (IBR) section of Mindtools , Conflict Resolution - resolving conflict rationally and effectively, and Barbara Bradbury addresses the concept in a lighter fashion in Resolving Conflict - 7 Inspired Tips for leaders, May 2011.
And, just to end on a visual note for those that have a more pictorial learning style, you'll appreciate the myriad images used to try and capture that conflict moment! Which makes most sense to you?
Happy resolutions!
Thursday, 2 June 2011
Clients' prior business experiences and the consequences for us
In these financially constrained times it means more to retain your clients rather than put your time and effort into finding new ones. That is, of course, unless the client has more than taken advantage of the relationship to the point that the people involved are in danger of losing your company money!
That said, do you know your company's churn? The average online company churn as of 2 years ago was reported as 98.7%! 60% of first time clients dropped their company within six weeks! See Harris Interactive Src Risk, Churn Win Back Workshop, slide 9. Harris Interactive states that if you retain clients then their value/spend increases with time. Now that can mean a lot.
Why do your clients leave? Have you any intelligence on this? Perhaps you should try to find out. It tends to be the role of the Account Manager/Project Manager to understand the reasons for leaving, but is the intelligence brought together and analysed in terms of your company performance?
Harris Interactive cites several reasons for clients defecting: unmet expectations, low perceived value, competitive attraction, and unexpressed/unresolved complaints. (See slide 14 Causes/Effects of Risk and Churn.) How are you defining defections?
It is hard to find general business information on client reactions and their impact but harder still for interactive media businesses. However, Garry, in his Intelligent Positioning Blog, the Integrating Value section of The Value in Understanding the Customer Journey, May 2011, makes clear statements about the failure of some companies to fully understand the customer experience of their clients. He says that only 30% had looked at mobile habits and only 34% had taken account of social media behaviour.
If what he says is true — that winning a new client costs up to 5 times more than retaining an old one — shouldn't we be analysing the risks of churn?
That said, do you know your company's churn? The average online company churn as of 2 years ago was reported as 98.7%! 60% of first time clients dropped their company within six weeks! See Harris Interactive Src Risk, Churn Win Back Workshop, slide 9. Harris Interactive states that if you retain clients then their value/spend increases with time. Now that can mean a lot.
Why do your clients leave? Have you any intelligence on this? Perhaps you should try to find out. It tends to be the role of the Account Manager/Project Manager to understand the reasons for leaving, but is the intelligence brought together and analysed in terms of your company performance?
Harris Interactive cites several reasons for clients defecting: unmet expectations, low perceived value, competitive attraction, and unexpressed/unresolved complaints. (See slide 14 Causes/Effects of Risk and Churn.) How are you defining defections?
It is hard to find general business information on client reactions and their impact but harder still for interactive media businesses. However, Garry, in his Intelligent Positioning Blog, the Integrating Value section of The Value in Understanding the Customer Journey, May 2011, makes clear statements about the failure of some companies to fully understand the customer experience of their clients. He says that only 30% had looked at mobile habits and only 34% had taken account of social media behaviour.
If what he says is true — that winning a new client costs up to 5 times more than retaining an old one — shouldn't we be analysing the risks of churn?
Saturday, 28 May 2011
Working together – the client/developer relationship
The key word here is relationship. We know that interactive project management is a collaboration between client and developer. Each needs to know their specific role and responsibilities within the project for the project process to flow. The 'relationship' element in the partnership has to be managed sensitively especially in interactive projects because the risks of misunderstanding between client and developer increase over and above other types of project. It's that cross-functional communication again - potentially causing gaps - let alone the changes/slippage syndrome.
The people that have bridged the relationship gap in iMedia projects have had various job titles depending on the background culture of the company. So we can have Account Managers, Project Managers/Team Leaders, and Client or Customer Relationship Managers. The Account Managers come from the Agency type of culture and has been deemed more on the creative side; the Project Manager/Team Leader is from a newer breed of iMedia companies and emerges from the software side; the Client/Customer Relationship Managers hail from the business and management side.
The Account Managers have traditionally had a more hands-on and personal relationship with the clients whereas the client/customer relationship managers are linked with the use of software packages that track and flag information about the clients that action responses from the managers. The Project Managers are in the middle of this. Whatever the role is called, it is a difficult one. A successful relationship manager has great people skills, keen business skills and a strong sense of commitment to finish a project that is successfully perceived from all sides. Hard, yes.
It was difficult to try to define this relationship role. There are some definitions of Customer Relationship Management (CRM) and so by inference what a CRM role is: see Verbatims - and is there parity across all the definitions?
Then there is an Account Relationship Manager's job description sample at Great Sample Resume
Andrew Sobel has defined 15 common pitfalls to Client Management in his Client Loyalty newsletter (PDF). Take a look and assess if you fall into any.
Finally - just because I'm a stirrer - have a look at the salary scale for Client Relationship Managers at, SalesTarget.
These don't answer all the questions raised by the various people in iMedia projects who fulfil the 'relationship management' role, but it starts the conversation!
The people that have bridged the relationship gap in iMedia projects have had various job titles depending on the background culture of the company. So we can have Account Managers, Project Managers/Team Leaders, and Client or Customer Relationship Managers. The Account Managers come from the Agency type of culture and has been deemed more on the creative side; the Project Manager/Team Leader is from a newer breed of iMedia companies and emerges from the software side; the Client/Customer Relationship Managers hail from the business and management side.
The Account Managers have traditionally had a more hands-on and personal relationship with the clients whereas the client/customer relationship managers are linked with the use of software packages that track and flag information about the clients that action responses from the managers. The Project Managers are in the middle of this. Whatever the role is called, it is a difficult one. A successful relationship manager has great people skills, keen business skills and a strong sense of commitment to finish a project that is successfully perceived from all sides. Hard, yes.
It was difficult to try to define this relationship role. There are some definitions of Customer Relationship Management (CRM) and so by inference what a CRM role is: see Verbatims - and is there parity across all the definitions?
Then there is an Account Relationship Manager's job description sample at Great Sample Resume
Andrew Sobel has defined 15 common pitfalls to Client Management in his Client Loyalty newsletter (PDF). Take a look and assess if you fall into any.
Finally - just because I'm a stirrer - have a look at the salary scale for Client Relationship Managers at, SalesTarget.
These don't answer all the questions raised by the various people in iMedia projects who fulfil the 'relationship management' role, but it starts the conversation!
Friday, 20 May 2011
Copyright back on the political agenda
I have written in the past about some of the currently contentious issues in intellectual property, such as orphan works and the use of metadata to preserve a creator's moral rights.
Recently there have been two calls for public input into the copyright process. One was a call for evidence by the Culture select committee, which has been put on hold for the moment, and the other was the Hargreaves Report.
Hargreaves had been touted as the 'Google Report' since it was suggested that one of its issues, changes to our copyright exceptions (called fair dealing) to match the American fair use model, had been somehow suggested to the Prime Minister by Google, by saying that our rights regime prevented the Googles of this world from starting here in the UK. Rory Cellan-Jones at the BBC put that very point to Google's Eric Schmidt, who admitted that getting a business underway in the USA was easier than in Europe but said he was "not aware" of Google saying this was a rights problem.
Elsewhere in Rory's BBC blog, and that of Arts colleague Will Gompertz there were postings on Hargreaves. What I recommend you do is read the comments, for the Battle of Waterloo will these days be won on the playing fields of blog comments. I have chipped in (and bit my tongue on several occasions) but ... within the severe size limits currently imposed by the BBC on such things ... the comments expose a lot of the obsessions and occasional ignorance of what is a very arcane area of law and very difficult for people to understand.
Apart from the fair use and orphan works bits in Hargreaves ... and a welcome call for format shifting and parody exceptions, one theme is of what I might dare call an improvement in fairness and openness in rights dealings. The Intellectual Property Office is urged to give examples of what you can and can't do, which would have some force of law, and the government is encouraged to make it more practical, and cost-effective, for small rights owners who have been infringed to gain redress.
One omission is that moral rights don't get a look-in. There will be areas of the creative industries, including the small corner where I shine my light, that will find that a serious flaw.
Oh, and the report (PDF here) also asks that it doesn't suffer the fate of some previous such reports and that the government acts on its recommendations. It looks as if copyright is back on the agenda.
Recently there have been two calls for public input into the copyright process. One was a call for evidence by the Culture select committee, which has been put on hold for the moment, and the other was the Hargreaves Report.
Hargreaves had been touted as the 'Google Report' since it was suggested that one of its issues, changes to our copyright exceptions (called fair dealing) to match the American fair use model, had been somehow suggested to the Prime Minister by Google, by saying that our rights regime prevented the Googles of this world from starting here in the UK. Rory Cellan-Jones at the BBC put that very point to Google's Eric Schmidt, who admitted that getting a business underway in the USA was easier than in Europe but said he was "not aware" of Google saying this was a rights problem.
Elsewhere in Rory's BBC blog, and that of Arts colleague Will Gompertz there were postings on Hargreaves. What I recommend you do is read the comments, for the Battle of Waterloo will these days be won on the playing fields of blog comments. I have chipped in (and bit my tongue on several occasions) but ... within the severe size limits currently imposed by the BBC on such things ... the comments expose a lot of the obsessions and occasional ignorance of what is a very arcane area of law and very difficult for people to understand.
Apart from the fair use and orphan works bits in Hargreaves ... and a welcome call for format shifting and parody exceptions, one theme is of what I might dare call an improvement in fairness and openness in rights dealings. The Intellectual Property Office is urged to give examples of what you can and can't do, which would have some force of law, and the government is encouraged to make it more practical, and cost-effective, for small rights owners who have been infringed to gain redress.
One omission is that moral rights don't get a look-in. There will be areas of the creative industries, including the small corner where I shine my light, that will find that a serious flaw.
Oh, and the report (PDF here) also asks that it doesn't suffer the fate of some previous such reports and that the government acts on its recommendations. It looks as if copyright is back on the agenda.
Labels:
copyright,
law,
orphan works
Saturday, 14 May 2011
Cookies ... half-baked or crumbling?
The Information Commissioner's Office has been busy with not one but two brand new documents for us to look over.
The first is a Data Sharing Code of Practice.
Those of us who handle data related to web sites are most likely to be doing this on behalf of a client (which makes us data processors rather than data controllers) although for our internal business purposed we will probably have some data that needs to be carefully handled in a controlling capacity, even if it is only personnel records.
However, even as data processors we have responsibilities, and you should make sure that the person responsible for your data looks over this code of practice.
In some ways that's the easy one. The other is yet another piece of legislation about cookies.
Just when we thought we'd covered ourselves for using cookies by explaining opt-outs and making sure we really needed to use them, those nice people at the European Commission are tightening the rules and the ICO has provided some guidelines.
Whereas clause 6(2) used to say we needed to advise the user about how we used cookies and told them how to opt out, now the clause says we have to advise the user about how we use cookies and get their consent.
There are exceptions for repeated visits (It looks to me that you only need to ask the first time) and for'strictly necessary' for a service requested by the user, which the ICO suggest is things like shopping carts. A user can also set global consent levels in a browser to signify consent.
Now I know you can set such things in a browser at the moment (no cookies, cookies only from the web site I'm visiting, any cookie) but the web site can't interrogate this. I'm sure the major browser manufacturers will have this sorted in time (sarchasm alert). Would a consent in sign-up terms and conditions be enough? What do you do about systems which already have signed-up users?
Oh ... and we have until May 26th to sort this out.
The first is a Data Sharing Code of Practice.
Those of us who handle data related to web sites are most likely to be doing this on behalf of a client (which makes us data processors rather than data controllers) although for our internal business purposed we will probably have some data that needs to be carefully handled in a controlling capacity, even if it is only personnel records.
However, even as data processors we have responsibilities, and you should make sure that the person responsible for your data looks over this code of practice.
In some ways that's the easy one. The other is yet another piece of legislation about cookies.
Just when we thought we'd covered ourselves for using cookies by explaining opt-outs and making sure we really needed to use them, those nice people at the European Commission are tightening the rules and the ICO has provided some guidelines.
Whereas clause 6(2) used to say we needed to advise the user about how we used cookies and told them how to opt out, now the clause says we have to advise the user about how we use cookies and get their consent.
There are exceptions for repeated visits (It looks to me that you only need to ask the first time) and for'strictly necessary' for a service requested by the user, which the ICO suggest is things like shopping carts. A user can also set global consent levels in a browser to signify consent.
Now I know you can set such things in a browser at the moment (no cookies, cookies only from the web site I'm visiting, any cookie) but the web site can't interrogate this. I'm sure the major browser manufacturers will have this sorted in time (sarchasm alert). Would a consent in sign-up terms and conditions be enough? What do you do about systems which already have signed-up users?
Oh ... and we have until May 26th to sort this out.